The project features 27 conveyors with a total length of 5100m.
Equipment used: The system includes transfer stations and comprises 2 standard mobile conveyors, 2 hydraulic lifting mobile conveyors, 2 bi-directional conveyors (BW 1400mm) with train unloaders, 1 retractable train feeders, 2 truck feeders, and 5 stockyard belt conveyors. Three installation forms are adopted: in-ground, pit, and overhead. Multiple tensioning methods are applied, including gravity take-up, double gravity take-up, trolley, screw, and hydraulic tensioning. The conveyors for train unloaders are BW 1400mm, while all other conveyors are BW 1200mm. The rated conveying capacity is 1200t/h, with a belt speed of 2.5m/s.