The project involves 21 belt conveyors spanning a total length of 1,100 m. The system uses three different belt tensioning methods: gravity take-up, screw take-up, and hydraulic take-up. Eight of these conveyors have a belt width of 1,200 mm, with a capacity of 800 t/h, and a belt speed of 2.0 m/s. The other thirteen conveyors are 1,000 mm wide, can handle 400 tons per hour, and have a speed of 1.6 meters per second.
