This project involves a dry-process gold ore crushing system with an annual production capacity of 1 million tons.
The project used equipment including: The system is arranged entirely outdoors and equipped with cold-resistant configurations. It adopts a truss structure with double-side maintenance walkways and includes a total of six belt conveyors with a belt width of 800mm, providing a total installed conveying length of 322m.
